SINGAPORE REGISTERED COMPANY · UEN 202316291K+65 9355 5975 ↗
ND company logoND CONSTRUCTION& ENGINEERING (S) PTE. LTD.

ND CONSTRUCTION & ENGINEERING (S) PTE. LTD.

Electrical Installation
& Power Upgrading
in Singapore.

RCU installations, isolator relocation and distribution board terminations. Supporting main contractors on electrical upgrading projects across Singapore.

RCU INSTALLATIONPOWER UPGRADINGDB TERMINATION
Electrical distribution panels at a project site
ON SITE / SINGAPOREElectrical Load Upgrading
Programme Works
01 / ND
REGISTERED ENTITYUEN 202316291KCLASSIFICATIONME05 (L1)*PROJECT RECORDSFrom August 2023Download company profile ↓
PROJECT EXPERIENCE ACROSS SINGAPORE
Pasir Ris • Tampines • Toa Payoh • Gim Moh • Hougang

01 / OUR COMPANY

Your Electrical Works
Partner in Singapore.

Focused on the requirements of your project.

ND CONSTRUCTION & ENGINEERING (S) PTE. LTD. provides electrical installation, modification and power system upgrading services in Singapore, with a focus on Electrical Load Upgrading Programme works.

From positioning panels and relocating isolators to making distribution board connections, we coordinate our work with main contractors and site teams to meet the agreed project scope.

Download Company Profile ↓

* Classification as stated in the company’s supplied particulars.

02 / WHAT WE DO

Our Electrical Services

Focused electrical services, from mounting and support works to power connections and system modifications.

01

RCU panel installation

Wall-mounted panel installation, secure fixing and coordinated cable entry arrangements.

02

Isolator relocation

Relocation from existing Unistrut supports to ceiling surfaces, with coordinated reconnection.

03

Power system upgrading

Electrical installation and modification works to suit approved power distribution requirements.

04

Unistrut support works

Support arrangements and associated works coordinated with the electrical installation.

05

DB termination

Cable preparation, distribution board connections, organisation and circuit identification.

06

RCU termination

Connections to designated terminals in line with the applicable wiring information.

THE WAY WE WORK

From Site Planning
to Project Handover.

We consider site access, existing services and installation sequencing before work begins. Clear communication helps our work fit into the wider project.

  1. 01

    Understand the scope

    Review installation details, locations and site requirements.

  2. 02

    Coordinate and execute

    Align work with the main contractor and other trades.

  3. 03

    Review and hand over

    Address outstanding items and coordinate required completion records.

03 / PROJECT EXPERIENCE

Singapore Project Experience

Electrical Load Upgrading Programme assignments recorded with our main contractors.

UTTAMA ENGINEERING PTE. LTD.

PROJECT REFERENCE · UEPL-ND-14-23-001
Aug 2023–Oct 2025
Condo 500–521

KHOON ENGINEERING CONTRACTOR PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Batch 2 Project 1 · Pasir Ris and Tampines
Apr 2024–Aug 2025
63, 64, 65 and 66

KHOON ENGINEERING CONTRACTOR PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Toa Payoh
Jul 2024–Sep 2025
100–100C · 12 blocks stated

SHIN KHAI CONSTRUCTION PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Batch 2 Project 4 · Pasir Ris and Tampines
Jun 2025–Jan 2026
393, 394, 395 and 396

SHIN KHAI CONSTRUCTION PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Batch 2 Project 4 · Additional block entry
Jun 2025–Jan 2026
500–521 · 23 blocks stated

COSBY PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Batch 3 Project 4 · Central Zone
May 2025–Sep 2026
Blocks 4–6

COSBY PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Batch 3 Project 4 · Gim Moh Road
May 2025–Sep 2026
Blocks 4–6

COSBY PTE. LTD. (under LA Eng.)

PROJECT REFERENCE · ELUP Batch 3 Project 4 · Hougang
Jan 2026–ongoing
422–427 · 6 blocks stated

KSK ENGINEERING PTE. LTD.

PROJECT REFERENCE · ELUP Batch 3 Project 3 · Pasir Ris Street 52
Dec 2025–ongoing
531–569 · 17 blocks stated

Periods and block details follow the company’s supplied schedule. Ongoing status is as recorded; block ranges may include selected blocks. Central Zone and Gim Moh Road share period and block fields in the source schedule.

OUR WORKING PRIORITIES

Workmanship

Attention to mounting security, cable organisation, connection quality and identification.

Site responsibility

Coordination of access, isolation and applicable site procedures with the responsible project team.

Clear communication

Keeping the main contractor informed of installation issues, constraints and progress.

05 / GET IN TOUCH

Discuss Your
Project Requirements.

Tell us about your electrical installation or upgrading requirements.

+65 9355 5975 ↗+65 9644 5886
[email protected] ↗[email protected] ↗
629 Aljunied Road, #07-19
Cititech Industrial Building
Singapore 389838
Get directions ↗

Send a Project Enquiry

Complete the details to prepare an email to our team.

Opens your email app. Your enquiry is sent only when you send the email.